Macroeconomic Phase-Transition Monitor

Last updated: 2026-09-17T00:12:04+00:00 · previous status: PHASE_1 · Historical validation · Research v2

Total score
0 / 100
Confirmation quorum
0 / 2 (not met)
Gate 1 · credit spreads
CLEAR
Gate 2 · 10Y yield
CLEAR
#IndicatorLatest valueTrigger conditionStatePoints
1Credit spread gate (HY OAS / Single-B OAS)
Tier 1 · gate
HY 276.0 bps · Single-B 285.0 bpsHY OAS >= 375 bps OR Single-B OAS >= 425 bpsCLEAR0 / 30
210Y Treasury yield (DGS10)
Tier 1 · gate
5.00%>= 5.10%CLEAR0 / 30
3Initial jobless claims, 4-week MA (ICSA)
Tier 2 · confirmation
206,000>= 250,000 (4-week moving average)CLEAR0 / 10
4GLD/CPER ratio (gold vs copper)
Tier 2 · confirmation
10.1927 (SMA50 9.9676, trigger >= 11.4627)>= 1.15 x 50-day SMA of ratioCLEAR0 / 10
5SPHB/SPLV ratio (high-beta vs low-vol)
Tier 2 · confirmation
1.9339 (SMA200 1.8043)< 200-day SMA of ratioCLEAR0 / 10
6BNO 20-day return (oil momentum)
Tier 2 · confirmation
+22.30%< -8.0% (20-day return)CLEAR0 / 10

How the status is decided

Step 1 · Tier 1 hard gates — at least one must fire (30 pts each)

Step 2 · Tier 2 confirmation quorum — at least 2 of 4 must fire (10 pts each)

Step 3 · State rules

PHASE 2 ACTIVE: ROTATE DURATION TO 35%, EXIT CYCLICALS
Any Tier 1 gate fires AND the confirmation quorum is met (≥ 2 of 4).
TACTICAL WARNING: YIELD PEAK DETECTED, WAIT FOR CREDIT CONFIRMATION
Gate 2 (10Y yield) fires AND the quorum is not met — regardless of Gate 1.
PHASE 1 ACTIVE: MAINTAIN HIGH CASH & REAL CARRY
Anything else — no confirmed phase transition.

Total score is the sum of all fired triggers (max 100 pts) and is informational only; the status itself is decided by the gates and quorum above. An indicator in an ERROR state never counts as triggered.