Framework handover — v7

Generated 2026-10-01T15:08:51+00:00 (content is versioned in the repo, not market-driven)

Framework handover — 2026-10-01. v7 is the live framework (monitor: /monitor-v5/, frozen at first live deploy). v1–v6 are archived below as historical records; their pages stay up, untouched. Track A (/expected-returns/) is unaffected — strategic posture, quarterly cadence, firewall intact (hard rule 7).

v7 methodology note

v7 live triggers (frozen 2026-10-01)

Track archive — v1–v6 historical record

TrackPageRoleStatus after the v7 handover
v1dashboard · backtestProduction early-warning trackSuperseded as the decision framework. Pages still regenerate daily (immutable track) as a historical record.
v2backtest-v2Research backtestHistorical record.
v3backtest-v3Research backtestHistorical record.
v4monitor-v4Research monitorHistorical record.
v5backtest-v5Research ruleset (frozen 2026-09-21)Superseded by v7 on the live monitor 2026-10-01. The frozen backtest page remains the ruleset record; the v5 frame still supplies the calendar, exit inputs and TAIL_OVERRIDE plumbing under the v7 layer.
v6backtest-v6Credit-gate scoping study (no live triggers)Research record. Its verdict — B OAS fails the arming screen, passes confirmation decisively — is absorbed into v7 (B+65/CCC+200 are the v7 confirmation legs).

The regime-analog and 1970s stress pages (/analog/, /backtest-70s/) remain reference material, not versioned trigger tracks.